Eastern Nile Technical Regional Office

Theme
Hydropower and Interconnection
Goals
Water Security
Programs
Dams and Hydropower Interconnection
Ownerships
ENTRO Document

Files in this item

Eastern Nile Reference Dam Safety Guidelines

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
Accessibility status
Open Access
Language
English
Type
Planning document
Abstract

The Reference Dam Safety Guidelines for EN Countries (July, 2014) define the overarching framework for dam safety of EN dams. In particular the Potential Consequences Classification system presented therein applies to all dams. This document presents the Small Dam Safety Guidelines which provides additional specific guidelines for small dams. If there are discrepancies between this guidelines and the Reference Dam safety guidelines, the latter shall take precedence. 

Similar Documents

BAS MPWRDS, Integrated Water Resources Development and Management Plan

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
01 Jul 2017
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Plan or blueprint

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.4 Jita

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.3 Jema

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.1 Chemoga

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document