Abstract
Main Report of the detailed delineation, description, and prioritization of 10 of the investment projects located in sub-basins other than the Abbay in Ethiopia that were identified by the 2007 Cooperative Regional Assessment (CRA) of watershed management in the Eastern Nile Basin. It contains detailed profiles of projects of manageable size (1000 – 2000 sq. km) and has 3 Annexes, one of which is an updated version of the Table of Project Profiles in the CRA. Annex 4 with detailed Project Repots and an Atlas of Maps were also produced as separate documents, but part of the same initiative, which was supported by the NBI Institutional Strengthening Project funded by the Nile Basin Trust Fund managed by the World Bank (2008 – 2012).